Terrazzino — home
← Installer resources

Terrazzino — Job-Site Card

Confirm against current TDS before use

Kit contents

1 gal Part A + ½ gal Part B (1.5 gal liquid) + 18 lb Terrazzino Aggregate

Mix ratio

1 gal Part A : ½ gal Part B : 18 lb aggregate (2:1 A:B by volume)

Pot life (at 70°F)

15–25 minutes

Target thickness

60 mils

Squeegee / rake setting

50–60 mil notched squeegee; or Wire gauge rake set to 1/20 in.–1/16 in. (about 50–62 mils)

Coverage

approx. 55 sq ft per kit at 60 mils (order +10%)

Application conditions

50–90°F with relative humidity below 85%. When RH exceeds 70%, let the material induct for 15 minutes before applying (remix before use).

Cure schedule (at 70°F)

Pot life (1½ gal volume)15–25 minutes
Tack free (dry to touch)4–6 hours
Recoat or topcoat6–9 hours
Light foot traffic12–24 hours
Full cure (heavy traffic)2–5 days

Layer order

  1. Prepared concrete substrate
  2. Terrazzino Moisture Vapor Control — 20 mils (planning)
  3. Terrazzino High Build Epoxy — 20 mils (planning)
  4. Terrazzino micro-terrazzo — 60 mils (target)
  5. Terrazzino Topcoat or Cera finish — 2–3 mils urethane (planning)